POLICIES
The principles that guide quality, coordination and responsible execution.
QUALITY IN
EVERY STAGE.
Quality Control Policy
All insulation and coating works undergo staged inspection—from substrate preparation and priming to membrane installation and flood or thickness testing.
Technical & Material Compliance
We strictly apply materials that match approved project submittals, technical data sheets (TDS), and manufacturer application instructions.
Site Organization & Coordination
Our teams operate in full alignment with main contractor site rules, work permits, and project schedules to ensure smooth trade handover.
Material Storage & Handling
Chemicals, membranes, and PU components are stored under controlled conditions on site to preserve material integrity prior to application.
Documentation & Submittals
Clear preparation of method statements, material submittals, inspection requests (WIR), and handover documentation for consultant approval.
Accountability & Handover
Commitment to rectifying any snag items promptly and delivering completed protection systems ready for subsequent construction phases.
DISCIPLINED
WORKFLOW.
Submittals & Approval
Reviewing BOQ specifications and submitting material data sheets and method statements.
Substrate Preparation
Cleaning, repairing defects, chamfering corners, and verifying surface readiness before application.
System Application
Executing waterproofing, thermal, or coating layers strictly per approved thickness and detailing.
Testing & Handover
Conducting flood tests or site inspections with the consultant and issuing formal WIR sign-off.
